![Pioneer concrete grain elevator in summer](https://www.grainelevators.ca/wp-content/uploads/2022/02/Kemnay-Pioneer-Grain-Elevator-20140809-SLB-3-1024x683.jpg)
The large concrete grain elevator at Kemnay outside Brandon, Manitoba went into operation in 2010, replacing a relatively large wooden elevator complex in Brandon. This elevator has a capacity of 20,400 tonnes and is served by the CP Carberry subdivision.
Historical Photos
![](https://www.grainelevators.ca/wp-content/uploads/2022/06/Kemnay-MB-Grain-Elevator-and-Station-and-Steam-Engine-1938-Lawrence-A-Stuckey-McKee-Archives-CPR-28-1024x763.jpg)
Back to Manitoba grain elevators