Lake Lenore

Grain elevators in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.
Grain elevators in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.

In 2009 there were three grain elevators in Lake Lenore, Saskatchewan. They had a combined capacity of 4,300 tonnes and were served by CN.

One elevator appears to have been a later UGG grain elevator, taken over by Pioneer.

Pioneer grain elevator in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.
Pioneer grain elevator in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.
Grain elevator in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.
Grain elevator in Lake Lenore, SK, June 2006. Contributed by Pat Scrimgeour.

The last grain elevator, the ex Saskatchewan Wheat Pool elevator, was toppled on January 23, 2018.

Demolition of last Lake Lenore grain elevator. Copyright by Glenda Lee Stuckel.
Demolition of last Lake Lenore grain elevator. Copyright by Glenda Lee Stuckel.

Back to Saskatchewan grain elevators